The Research Institute of Technological Progress is offering:
PIPES
with VAT
Code | Description | GOST,TU | Steel
grade |
Dia-
meter |
Wall
thickness, mm |
Unit of
measurement |
Price,
in $ |
1321 | Casing pipes | 632-80 | D
ELM |
146 | 7-9 | ton | 800
1560 |
Extra | payment for | OTTM thread
Batress thread |
10% 25% |
||||
1324 | Drill pipes | 14-3-1849-92
14-3-1571-88 14-161-138-94 |
D
E D E D ELM |
73
114 127 |
9.0
9.0 8.56 10.92 9.2 9.2 |
ton | 2030
2340 1700 1880 1680 2110 |
1327 | Pipes NKT | 633-80,
14-3-1772 |
D
KELM |
60-114 | 5-7 | ton | 950
1330 |
1319 | Rolled pipes | 8732-78 | 10-20 | 57-83
89-159 |
3.5-6
6-12 |
ton | 770
780 |
1341 | Drawn pipes KVD | 14-3-460-75 | 20K
12H1MF |
16-45
Extra |
2.5-5.5
payment for |
ton
steel grade |
1980
30% |
1344 | Drawn pipes | 8734-75 | 10-20 | 25-57 | 2.5-5 | ton | 1060 |
1351 | Thin-wall seamless pipes | 8734-75 | 10-20
10-20 30HGSA |
6-22
25-45 Extra |
1-4
1.4-2.2 payment for |
t.m
t.m steel grade |
1180
1625 210% |
1373 | Electric-welded pipes | 10704-76
10707-80 |
10-20 | 25-53
10-40 |
1.5-2.2
1-2.2 |
t.m | 1060
1120 |
1375 | Seam pipes | 11249-80 | 08KP | 4.75-12 | 0.7-0.9 | t.m | 210 |
130505 | Stainless steel pipes | 9941-81 | 12H18N10T
- - - - 10H17N13M2T |
6-30
32-51 20 25 57 Extra |
1-4
2-4.5 2 2 4 payment for |
t.m
- - - - steel grade |
8463
16850 8780 8070 7020 55% |
1461 | Cast-iron pipes | 14-3-1247-83
14-3-1848-91 |
100-300
400-1000 |
ton | 560
485 |
||
1231 | Strip | 503-81
3560-73 |
10.08KP
without steel grade |
0.3-2
0.3-1.5 |
10-190
20-50 |
ton | 1010
885 |
Extra payment for cutting to different length: + 10%
Prices are given free warehouse (Russian Federation, Sverdlovsk Oblast, Kamensk-Uralskii.
Joods can be delivered to the Customers by railway and by automobile transport.
Discount up to 15% when buying wholesale. Discount up to 20% to regular Customers.
Terms of payment: 100% letter of credit in $.
Term of shipment from the date of opening the letter of credit - 10-18 days.